Aesthetically pleasing installation…’Through the engineering design process, the airport authority was hesitant to have a ‘metallic’ box running down the side of the building, impacting the exterior look of the building. The RailMast was painted to match the building facade making it aesthetically pleasing to the airport authority, as it looked no different than the downspout on the opposite corner of the building.